Monday: no plant today
Good day to all. Hope you are feeling like working today, because we have a lot to accomplish today. But, to start off, we will be taking the First Quarter Survey .

After that, we will be focusing on schematic design. You will do a rendering practice before you actually start your Schematic Design for the music garden. I have the sheet for you to practice on. Be sure, if you are using markers, to have your drawing journal under the paper so we do not get marker on the table. Today will be your practice, use this time to get your drawings done. Wednesday we will be starting your final Schematic Designs.

As you are doing this, I will be coming around checking all of your progress drawings to this point. That includes:
Site Inventory and Analysis (two drawings)
Program List and Relationship Diagrams (three drawings)
Conceptual Designs (two drawings)

All of the above drawings will be graded today, I have given too many extensions as it is.

Wednesday: Calocedrus decurrens
Good morning everyone. I hope you are excited about starting your schematic drawings. First we will watch few school videos and then take the survey.
Landscape 1st Qtr Survey